Question: Seattle manufactures engine brackets, which including only two processes: Forming and Drilling Its Availability is Availability: 8 hours per shift with a 30-minute lunch break
Seattle manufactures engine brackets, which including only two processes: Forming and Drilling
Its Availability is "Availability: 8 hours per shift with a 30-minute lunch break "
Its Average Daily Demand from customers is 3000 units per day.
The value stream table is as follows:
| Step 1: Forming | Cycling time = | 11 | seconds |
| Setup Time = | 3 | Minutes | |
| Uptime = | 100% | ||
| Operators = | 1 | ||
|
| WIP (before Forming) = | 4000 | units |
| Step 2: Drilling | Cycling time = | 10 | seconds |
| Setup Time = | 2 | Minutes | |
| Uptime = | 100% | ||
| Operators = | 1 | ||
|
| WIP (before Drilling) = | 5000 | units |
What is the total processing time of the value stream?
Group of answer choices
32 seconds
21 seconds
35 seconds
42 seconds
36 seconds