Question: Select which construction delivery method best fits the following description. A delivery system which is a low-cost delivery of the project to the owner by
Select which construction delivery method best fits the following description. A delivery system which is a low-cost delivery of the project to the owner by the general contractor. The owner selects the design team who then produces the construction documents that define the location, appearance, materials, and methods to be used in the creation of the building and its infrastructure. Then, general contractors bid on the project, with the lowest qualified bidder receiving the job. Group of answer choices integrated project delivery construction management-at-risk (CM@R) design-build design-bid-build