Question: SHOW YOUR WORK USING EXCEL SHEETS AND PROVIDE LINK 33. Maximizing Traffic Flow. For the following highway network system, determine the maximal flow in vehicles


SHOW YOUR WORK USING EXCEL SHEETS AND PROVIDE LINK
33. Maximizing Traffic Flow. For the following highway network system, determine the maximal flow in vehicles per hour: The highway commission is considering adding segment 34 to permit a flow of 2000 vehicles per hour or, at an additional cost, a flow of 3000 vehicles per hour. What is your recommendation for the proposed segment 34 of the highway network? LO 5