Question: Solve these problems and upload your solution to Canvas. You can solve them by hand or using Excel. Show all your work ( typed in

Solve these problems and upload your solution to Canvas. You can solve them by hand or
using Excel.
Show all your work (typed in the document, pasting a scanned image of your handwritten
solution, or by uploading an Excel file with your solution). Also, provide your answer in the
provided tables.
Problem 1(12 points)
A production line has three machines A, B, and C, with reliabilities of 0.90,0.95, and 0.92,
respectively. The machines are arranged so that if one breaks down, the others must shut down.
Engineers are weighing two alternative designs for increasing the lines reliability. Plan 1 involves
adding an identical backup line, and plan 2 involves providing a backup for each machine. In either
case, three machines (A, B, and C) would be used with reliabilities equal to the original three.
a. Compute overall system reliability under Plan 1.
(Round your intermediate calculations and final answer to 4 decimal places.)
b. Compute overall system reliability under Plan 2.
(Round your intermediate calculations and final answer to 4 decimal places.)
c. Which plan will provide the higher reliability?
(i) plan 1
(ii) plan 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!