Question: Solve these problems and upload your solution to Canvas. You can solve them by hand or using Excel. Show all your work ( typed

Solve these problems and upload your solution to Canvas. You can solve them "by hand" or
using Excel.
Show all your work (typed in the document or pasting a scanned image of your handwritten
solution). Save your solution document in a .pdf file and upload it to Canvas along with an
Excel file for calculations performed in Excel.
Problem 1(8 points)
A worker-machine operation was found to involve 4.6 minutes of machine time per cycle in the
course of 40 cycles of stopwatch study. The worker's time averaged 3.1 minutes per cycle, and the
worker was given a rating of 121 percent (machine rating is 100 percent). Midway through the study,
the worker took a 10-minute rest break. Assuming an allowance factor of 13 percent of work time
which is applied only to the worker element (not the machine element), determine the standard time
for this job. (Do not round intermediate calculations. Round your final answer to 2 decimal places.)
 Solve these problems and upload your solution to Canvas. You can

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!