Question: **Solve using LINGO** I repeat LINGO, looking to clarify my answer. Will upvote if done in the software Lingo, thanks in advance. (20 marks) A

**Solve using LINGO** I repeat LINGO, looking to clarify my answer. Will upvote if done in the software Lingo, thanks in advance.
(20 marks) A machine shop has six jobs waiting to be done. There are six machines available to do these jobs, and the shop will assign each job to a specific machine. The machines differ in their capabilities, so the times to do each job are different. The following table gives the number of minutes required to do each job, depending on the machine to which it is assigned. (a) The shop wishes to minimize the total number of minutes used to do these jobsStep by Step Solution