Question: Some for this problem. A process that is considered to be in control measures an ingredient in ounces. Below are the last 10 samples (each

Some for this problem. A process that is
Some for this problem. A process that is considered to be in control measures an ingredient in ounces. Below are the last 10 samples (each of size n = 5) taken. The population process standard deviation is 1.36. 3 1 10 10 11 9 13 2 11 9 11 10 11 14 8 10 10 10 4 11 11 12 9 9 Samples 5 6 11 10 10 9 8 B 11 11 10 8 7 11 11 10 8 9 8 14 16 9 10 7 9 7 8 12 13 9 10 11 12 8 8 12 a) Standard deviation of the sampling means - ounces (round your response to the desimal olacoal b) With z 3, the control limits for the mean chart are: Definition UCL;= ounces (round your response to three decimal places). LCL; -ounces (round your response to three decimal places). Sample c) The control limits for the R-chart are: UCLR-ounces (round your response to three decimal places). LCLR-ounces (round your response to three decimal places). Lower Range D 0 Yes Size, 2 3 4 5 6 7 8 9 10 12 No Mean Factor, A 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 0.266 Upper Range D 3.268 2.574 2.282 2. 115 2.004 1.924 1.864 1.816 1.777 1.716 OOOO d) Based on the x-chart is one or more samples beyond the control limits? 0.076 0.138 0.184 0.223 0.284 Based on the R-chart, is one or more samples beyond the control limits

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!