Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2009, SWU hired the legendary Phil Flamm as its head coach. TABLE 3.6 Southwestern University Project ACTIVITY DESCRIPTION A B с D E F G H I J K L Bonding, insurance, tax structuring Foundation, concrete footings for boxes Upgrading skybox stadium seating Upgrading walkways, stairwells, elevators Interior wiring, lathes Inspection approvals Plumbing Painting Hardwar etal workings Tile/carpet/windows Inspection Final detail work/cleanup PREDECESSOR(S) OPTIMISTIC A A с B E D, F I IG J I, K 28884 on goog 20 20 50 30 25 0.1 25 10 20 0.1 20 TIME ESTIMATES (DAYS) MOST LIKELY PESSIMISTIC 40 80 100 100 35 88888 30 65 60 50 30 0.1 30 20 25 10 0.1 25 0.1 35 30 60 12 0.1 60 CRASH COST/DAY $1,500 3,500 4,000 1,900 9,500 0 2,500 2,000 2,000 6,000 0 4,500 One of Flamm's demands on joining SWU had been a new stadium. With attendance increasing, SWU administrators began to face the issue head-on. After 6 months of study, much political arm wrestling, and some serious financial analysis, Dr. Joel Wisner, president of Southwestern University, had reached a decision to expand the capacity at its on- campus stadium. Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Flamm had argued the need for a first-class stadium, one with built-in dormitory rooms for his players and a palatial office appropriate for the coach of a future NCAA champion team. But the decision was made, and everyone, including the coach, would learn to live with it. The job now was to get construction going immediately after the 2015 season ended. This would allow exactly 270 days until the 2016 season opening game. The contractor, Hill Construction (Bob Hill being an alumnus, of course), signed his contract. Bob Hill looked at the tasks his engineers had outlined and looked President Wisner in the eye. "I guarantee the team will be able to take the field on schedule next year," he said with a sense of confidence. "I sure hope so," replied Wisner. "The contract penalty of $10,000 per day for running late is nothing compared to what Coach Flamm will do to you if our opening game with Penn State is delayed or canceled." Hill, sweating slightly, did not need to respond. In football-crazy Texas, Hill Construction would be mud if the 270-day target was missed. Back in his office, Hill again reviewed the data (see Table 3.6) and noted that optimistic time estimates can be used as crash times. He then gathered his foremen. "Folks, if we're not 75% sure we'll finish this stadium in less than 270 days, I want this project crashed! Give me the cost figures for a target date of 250 days-also for 240 days. I want to be early, not just on time!" Discussion Questions If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times. Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2009, SWU hired the legendary Phil Flamm as its head coach. TABLE 3.6 Southwestern University Project ACTIVITY DESCRIPTION A B с D E F G H I J K L Bonding, insurance, tax structuring Foundation, concrete footings for boxes Upgrading skybox stadium seating Upgrading walkways, stairwells, elevators Interior wiring, lathes Inspection approvals Plumbing Painting Hardwar etal workings Tile/carpet/windows Inspection Final detail work/cleanup PREDECESSOR(S) OPTIMISTIC A A с B E D, F I IG J I, K 28884 on goog 20 20 50 30 25 0.1 25 10 20 0.1 20 TIME ESTIMATES (DAYS) MOST LIKELY PESSIMISTIC 40 80 100 100 35 88888 30 65 60 50 30 0.1 30 20 25 10 0.1 25 0.1 35 30 60 12 0.1 60 CRASH COST/DAY $1,500 3,500 4,000 1,900 9,500 0 2,500 2,000 2,000 6,000 0 4,500 One of Flamm's demands on joining SWU had been a new stadium. With attendance increasing, SWU administrators began to face the issue head-on. After 6 months of study, much political arm wrestling, and some serious financial analysis, Dr. Joel Wisner, president of Southwestern University, had reached a decision to expand the capacity at its on- campus stadium. Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Flamm had argued the need for a first-class stadium, one with built-in dormitory rooms for his players and a palatial office appropriate for the coach of a future NCAA champion team. But the decision was made, and everyone, including the coach, would learn to live with it. The job now was to get construction going immediately after the 2015 season ended. This would allow exactly 270 days until the 2016 season opening game. The contractor, Hill Construction (Bob Hill being an alumnus, of course), signed his contract. Bob Hill looked at the tasks his engineers had outlined and looked President Wisner in the eye. "I guarantee the team will be able to take the field on schedule next year," he said with a sense of confidence. "I sure hope so," replied Wisner. "The contract penalty of $10,000 per day for running late is nothing compared to what Coach Flamm will do to you if our opening game with Penn State is delayed or canceled." Hill, sweating slightly, did not need to respond. In football-crazy Texas, Hill Construction would be mud if the 270-day target was missed. Back in his office, Hill again reviewed the data (see Table 3.6) and noted that optimistic time estimates can be used as crash times. He then gathered his foremen. "Folks, if we're not 75% sure we'll finish this stadium in less than 270 days, I want this project crashed! Give me the cost figures for a target date of 250 days-also for 240 days. I want to be early, not just on time!" Discussion Questions If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times.
Expert Answer:
Answer rating: 100% (QA)
To crash the project to 250 or 240 days Hill Construction would need to identify the critical path and determine which activities can be shortened wit... View the full answer
Related Book For
Principles of Operations Management Sustainability and Supply Chain Management
ISBN: 978-0134181981
10th edition
Authors: Jay Heizer, Barry Render, Chuck Munson
Posted Date:
Students also viewed these general management questions
-
Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown...
-
Southwestern University (SWU), a large state college in Stephenville, Texas, enrolls close to 20,000 students. The school is a dominant force in the small city, with more students during fall and...
-
Southwestern University (SWU), a large state college in Stephenville, Texas, enrolls close to 20,000 students. The school is a dominant force in the small city, with more students during fall and...
-
The portfolio of stock that comprises the ASX200 index is currently worth $5000. The continuously compounded interest rates on Australian government bonds is 1.5% per annum for each of the next five...
-
Which of the following statements about cross-bridges is false? a. They are composed of myosin. b. They bind to ATP after they detach from actin. c. They contain an ATPase. d. They split ATP before...
-
How is the amount of impairment to be recorded determined?
-
The following data are for Marvin Department Store. The account balances (in thousands) are for 2017. 1. Compute (a) the cost of goods purchased and (b) the cost of goods sold. 2. Prepare the income...
-
Job costing, accounting for manufacturing overhead, budgeted rates. The Fasano Company uses a job-costing system at its Dover, Delaware, plant. The plant has a machining department and a finishing...
-
What are the capabilities of online analytical processing (OLAP)? What is the value of this tool to business? Is OLAP much different from data mining and warehousing? Explain..!
-
Show that the probability that the period of f(x)=a x mod M is odd is at most 1/2.
-
Y8 Assume the futures price of a commodity is equal to the future value of the cash price, calculated at the risk-free rate. Given this, which one of the following terms applies to the market for...
-
Consider the following balance sheet data for Lilys Home Accessories: Cash & equivalents $ 86,500 Accounts payable $ 85,000 Accounts receivable 139,500 Notes payable 163,500 Inventories 298,500...
-
look up and identify one social welfare agency, one regulatory agency, and one public service agency. Describe each agency and whether it is an executive or independent agency. give citations and...
-
Cherie a visiting scientist from America was scheduled to give a lecture at a University, entitled "The Myth of Climate Change". Cherie's impending visit attracted lots of attention because she was...
-
A primary goal of a behavioral skills assessment is to determine whether the lack of occurrence of a specific behavior is due to a skill deficit (e.g., the individual has never emitted the behavior...
-
How does social control theory relate to organized criminal behavior?
-
How might a teenagers age affect diagnoses of acute stress disorder and recommendations for counseling?
-
Discuss the information available from the following techniques in the analysis of inorganic pigments used in antique oil paintings: (i) Powder X-ray diffraction, (ii) Infrared and Raman...
-
Using the data in Problem, Meredith and Smunt Manufacturing expects sales of pumps to grow by 10% next year. Compute next year's sales and the sales for each quarter. In Problem Meredith and Smunt...
-
Given the probabilities below, calculate the expected breakdown cost. Number of Breakdowns _______________ Daily Frequency 0 ....................................................... 3 1...
-
The initial external tank for NASA's Space Shuttle took 400 hours of labor to produce. The learning rate is 80%. How long will the twentieth tank take?
-
Suppose that you are a project manager asked to develop the network activity diagram and identify the critical path for a project based on the following information. Draw the activity network as a...
-
You are considering whether or not to crash your project. After asking your operations manager to conduct an analysis, you have highlighted the precrash and postcrash activity durations and costs of...
-
Reconfigure the Gantt chart in Problem 10.13 to include some different predecessor relationships. Optional: Solve this problem with Microsoft Project. a. Assume that activities B and C are linked...