Question: Station 1 Machine A 20 minutes/unit Station 1 Machine B 20 minutes/unit Station 1 Machine A 20 minutes/unit Station 1 Machine B 20 minutes/unit Station

Station 1 Machine A 20 minutes/unit Station 1
Station 1 Machine A 20 minutes/unit Station 1
Station 1 Machine A 20 minutes/unit Station 1
Station 1 Machine A 20 minutes/unit Station 1 Machine B 20 minutes/unit Station 1 Machine A 20 minutes/unit Station 1 Machine B 20 minutes/unit Station 2 Machine C 12 minutes/unit Station 2 Machine C 12 minutes/unit Station 2 Machine E 12 minutes/unit Station 3 Machine D 8 minutes/unit Station 3 Machine D 8 minutes/unit Cook Controls is looking to open a new manufacturing location. The locations were rated on 6 characteristics and each characteristic was given a certain weight factor. Based on this, which location would you choose? Factor Labor Availability Technical School Quality Operating Cost Land and Construction Cost Industrial Incentives Labor Cost City A B C D E Weight Factor Akron, OH F G 0.15 0.10 0.30 0.15 0.20 0.10 90 95 80 60 90 75 Biloxi, MS 80 75 85 80 75 80 Locations Map Coordinates (5,10) (6,8) (4,9) (9,5) (7,9) (3,2) (2,6) Carthage, TX 90 65 95 90 85 85 Denver, CO 80 85 85 70 The following table shows the map coordinates and shipping load. Based on this, what map coordinate makes the most sense to build a hub? 60 75 Shipping Load 5 10 15 5 15 10 5

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!