Step 1 Step 2 HA Step 3 Processing Time: 1 Minute/Part Processing Time: 2 Minutes/Part Processing Time: 1.5 Minutes/Part Setup Time: 20 Minutes No Setup No Setup Work is processed in batches at each step. Before a batch is processed at step 1, the machine has to be set up. During a setup, the machine is unable to process any product. a. Assume that the batch size is 50 parts What is the capacity of the process? b. For a batch size of 10 parts, which step is the bottleneck for the procese