Question: Superb Manufacturing is using a Kanban system for a component part. The demand for the component is 225 parts/hr. A container with 39 parts can
Superb Manufacturing is using a Kanban system for a component part. The demand for the component is 225 parts/hr. A container with 39 parts can be manufactured and delivered in 79min. The safety factor is set to 8% of hourly demand. What is demand during lead time? (Round it to two decimal points)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts