Question: T. Tm Activities A B Tp 14 unu By using PERT, (a) Draw the network diagram. (b) Determine, Te, S, V, ES, EF, LS, LF,

T. Tm Activities A B Tp 14 unu By using PERT, (a) Draw the network diagram. (b) Determine, Te, S, V, ES, EF, LS, LF, Slack and C.P for the following table. Assume D = 38 weeks. (c) Calculate o and Z. 8 11 4 29 7. | Path 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8 11 Tlalmolo 17 5 14 27 9 8 2 7 2 13 31