Question: Task Name Predecessor Normal time Crash time Normal cost 35 100 Crash cost (slope) 10 A 4 3 B 5 4 30 . 25 25

Task Name Predecessor Normal time Crash time
Task Name Predecessor Normal time Crash time Normal cost 35 100 Crash cost (slope) 10 A 4 3 B 5 4 30 . 25 25 D AB B.C D ANU E 80 90 95 100 90 4 3 2 4 F D.E 2 1 G H 20 35 E 4 3 BO 85 1 F.G.H 1 1 The Based on the above, the first activity that is selected to reduce the project duration is project duration at the CRASH POINT (the minimum possible duration for the project) is days. The indirect cost with norral times is $300 and there is a savings of $25 per period reduced. The crash cost (costat the CRASH POINT) is $ The optimum cost-time schedule (the schedule with minimum total cost and corresponding time) is periods and s Note: Enter the values for each item within square brackets

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!