Question: TECHNICAL DATA PROCEDURE 4 . 1 . SET UP Position the empty tank on the hydraulic bench Adjust the screwed feet until the base is
TECHNICAL DATA
PROCEDURE
SET UP
Position the empty tank on the hydraulic bench
Adjust the screwed feet until the base is horizontal
Ensure the drain valve is closed
READINGS
Balance the horizontal mast to be horizontally
Attach a mass hanger of g to the horizontal mast, this
will take your horizontal mast off balance.
Add water to the reservoir box until the quadrant reaches
the balance position indicated by the level mark on the
balance arm. The quadrant now is partially submerged.
Read the depth of immersion from the scale on the face of
the quadrant.
Repeat by adding more weights to the hanger with the
increment of g each time read the depth of immersion
from the scale.
Continue until height of the quadrant is completely
submerged.
EXPERIMENTAL DATA
CALCULATIONS
Calculate the hydrostatic force thrust exerted on the quadrant.
Determine the experimental depth of centre of pressure.
Determine the theoretical depth of centre of pressure.
Comment on the variation of thrust with depth.
Comment on the relationship between the depth of the centre of
pressure and the depth of immersion.
RESULTS
tableReadrupsgood day tutor can uou please help me out eith the questions above
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
