Question: Ten samples were collected from a production line. Each sample contains 7 units (observations) . You are asked to develop an X chart to monitor
Ten samples were collected from a production line. Each sample contains 7 units (observations). You are asked to develop an X chart to monitor the average of the 7 units based on the ten samples. Assume the averages of the 10 samples are X11 , X22 , ...., X1010 . Each of the ten x-bar values is obtained from averaging the measures of the 7 randomly collected units in a sample. The sum X11 + X22 + ....+ X1010 =800. The sum of the ranges from the ten samples, R1+R2+...+R10=56. [Since partial results are given, no detailed sample measures on the individual units are needed.]
Construct a 3 mean chart (X-bar chart) using Table 10.3 (Round all answers to three decimal places.)
(1) The quality standard is (the center line):
(2) The lower control limit is (LCL):
Construct a 3 R chart:
(3) The quality standard is (the center line):
(4) The upper control limit is (UCL):
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts