Question: The 2 0 0 , 0 0 0 sq . ft . facility has been manufacturing flanges in Indianapolis, IN for the past 5 0
The sq ft facility has been manufacturing flanges in Indianapolis, IN for the past years. Flanges are bolted, steel plates used to connect pipes with one and other. Manufacturing of flanges consists of five operations: hot forging; batch normalizing; turning; drilling; and assembly. As is typical of a facility of this age, all production assets are fully depreciated.
To address some issues within the facility, senior management has asked for a presentstate VSM covering all aspects of flange manufacturing, from incoming raw materials to outgoing finished products. Management has likewise asked for a futurestate VSM to address any issues uncovered.
Outgoing Logistics
Flanges made in the factory are shipped to the companys distribution center in Muncie, IN The distribution centers standing piece weekly production order is issued to the factory through SAP enterprise resource planning software The logistics department arranges for pickup from the factorys finished product warehouse every Friday at the end of the production shift for evening delivery to Muncie. Recently, the logistics department at the distribution center has been complaining about excessively long manufacturing lead times as compared to the industry standard of two weeks.
Incoming Logistics
The factory manufactures flanges from steel bars. Each bar weighs kg and costs USD excluding delivery fee The steel bar supplier is located in Gary, IN The bar vendor is capable of delivering every week, every two weeks, every three weeks, and so forth. The purchasing department issues a purchase order PO through SAP for steel bars to be delivered every four weeks. The transportation cost is USD per truckload. A single truck can carry kgs of bar. Every week, the purchasing department at the flange manufacturer sends a USD PO for a single pallet of screws. Of that amount, USD is for screws ie USD screw The courier charges USD per pallet delivered. Pallets can hold up to screws. The distributor, which is located in Evansville, IN is only able to offer weekly pallet shipments to Indianapolis out of its warehouse.
Presently, there are steel bars and screws in the raw materials warehouse at the factory. The carrying cost of steel bar inventory is of the total amount spent on bars in inventory excluding transportation cost The annual carrying cost of screws is likewise, of the total amount spent on screws inventory excluding transportation cost Delivery of bars from the vendor in Gary has been an issue. On average, shipments are one day late. Screws, however, are always delivered on time.
Manufacturing Operations
The flangemaking factory is open weeks per year, five days per week, eight hours per shift, and three shifts per day. The production office does not plan for processes to be running for all eight hours in a shift. Actual production time available is assumed to be at overall equipment efficiency OEE
Hot Forging In the hot forging department, one flange is made from kg of bar stock not including scrap Forging involves three steps:
induction heating bar to deg C
shearing bar into segments of appropriate length; and then
closed die shaping segments.
The factorys two bar forging lines were purchased for USD each. Each line is run by a single operator and runs a second cycle time. Uptime in the forging department averages Scrap is
Batch Normalizing After forging, steel grains making up the flange are too distorted for machining. Parts must be cooled for a day and then transferred into steel tubs for a batch heattreating process called normalizing. Approximately parts fit into a tub. The normalizing furnace was purchased for USD Depreciation was done on a straightline basis over years, as is standard at the facility. One person operates the furnace and is capable of processing kg per hour. Uptime is After normalizing, parts must be placed in a holding area for at least one day to allow them to reach room temperature for subsequent machining
Turning Turning is done on the opposite side of the factory from normalizing and drilling. This is because only the side of the factory where turning is located is plumbed for turning coolant. The turning department has three machining centers, each operated by a single machinist. One turning center costs USD Cycle time per machine is seconds. Average uptime in the turning area is Scrap is
Drilling After machining, flange holes are drilled. The factory has six computerized numerical controlled CNC drills. Each was purchased for USD It takes seconds to drill and tap four screw holes. Drilling is highly automated and located adjacent to assembly. One operator runs all six drills. Average uptime in the turning area is Scrap is
Step by Step Solution
There are 3 Steps involved in it