Question: The answer is not 4.6 A lean system has 23 containers, each of which can hold 16 parts. The lead time required to round-trip one
The answer is not 4.6

A lean system has 23 containers, each of which can hold 16 parts. The lead time required to round-trip one container through the system is four hours. The required safety stock is 15 percent. a. What is the maximum demand rate this system can accommodate? Do not round intermediate calculations. Round your answer to the nearest whole number parts/hr
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts