Question: don't use chatgpt.....A lean system has 2 3 containers, each of which can hold 1 0 parts. The lead time required to round - trip
don't use chatgpt.....A lean system has containers, each of which can hold parts. The lead time required to round trip one container through the system is four hours. The required safety stock is percent. a What is the maximum demand rate this system can accommodate? Do not round intermediate calculations, Round your answer to the nearest whole number. partshrb The company wants to accommodate double the maximum demand rate found in a What are all the ways the system could be changed to accomplish this? I. Reduce S to I Double # of containers lII. Reduce T to hr IVIncrease C to parts A lean system has containers, each of which can hold parts. The lead time required to roundtrip one container through the system is tour hours. ne required safety stock is percent. a What is the maximum demand rate this system can accommodate? Do not round intermediate calculations. Round your answer to the nearest whoile numiber b The company wants to accommodate double the maximum demand rate found in o What are all the ways the system could be changed to accompish this Reduce s to Double # of containers IIL. Reduce Tto hr TV Increase C to parts Select
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock