Question: The critical path for the network activities shown below is with duration A. A-C-E; 20 B. A-D-E; 19 C. A-B-C-D-E; 29 D. A-C-E; 18 E.

The critical path for the network activities shown below is with duration A. A-C-E; 20 B. A-D-E; 19 C. A-B-C-D-E; 29 D. A-C-E; 18 E. B-E; 13 QUESTION 15 The Dulac Box plant produces 800 cypress packing boxes in two 8-hour shifts. What is the productivity of the plant? A. not enough data to determine productivity B. 50 boxes/hr C. 25 boxes/hr D. 5000 boxes/hr E. 100 boxesihr
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
