Question: The Drill operation occurs separately from, and simultaneously with, the Cutting and Bending operations. The product only needs to go to one of the three

The Drill operation occurs separately from, and simultaneously with, the Cutting and Bending operations. The product only needs to go to one of the three Packing operations that are in parallel.

The Drill operation occurs separately from, and

What is the bottleneck process?

What is the throughput time for the overall system?

If the firm operates 9 hours/day, 20 days per month, what is the monthly capacity of this manufacturing system?

Hossein retrains the drilling worker and the time for that operation drops to 5 mins per unit. What is the new bottleneck?

Now, how many units per month can the system make?

What is the throughput time now?

Cut Bend Pack 24 mins/unit 9 mins/unit 6 mins/unit Assemble Pack 24 mins/unit 10 mins/unit Drill Pack 24 mins/unit 12 mins/unit Mins/Unit Stations Time Pack 24 3 Cut 9 1 Bend 6 1 Assemble 10 1 Drill 12 1 The 'time' column is left blank, as you will do this calculation as part of the quiz below. Days/month 20 Mins/hour 60 Hours/Day 9 Total Time 10800

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!