Question: The engineering method of estimating costs: Multiple Choice is often based on optimal conditions. can detail each step required to perform an operation. can be
The engineering method of estimating costs:
Multiple Choice
is often based on optimal conditions.
can detail each step required to perform an operation.
can be quite expensive to use.
does not require data from prior activities in the organization.
All of these are correct statements.