Question: The following represents a project that should be scheduled using CPM:Here is a network with the activity times shown in days: A diagram shows a
The following represents a project that should be scheduled using CPM:Here is a network with the activity times shown in days:
A diagram shows a critical path through A B C D E F and GA diagram shows a critical path through A B C D E F and G It shows circles labeled as A B C D E F and G A is connected to B and C B ad C are connected to D D leads to F and E F and E are connected to G
a Find the critical path.
multiple choice
ABDFG
ACDFG Correct
ABDEG
ACDEG
The following table shows the normal times and the crash times, along with the associated costs for each activity.
ACTIVITY NORMAL TIME CRASH TIME NORMAL COST CRASH COST
A $ $
B
C
D
E
F
G
b If the project is to be shortened by four days, which activities, in order of reduction, would be shortened?
multiple choice
A C D or F F or D Correct
A F D or E
E A
C F or E D or E
b Find the resulting cost to crash.
the critical path?
multiple choice
ACFH
ADFH
BEGH
ADGH
What is the expected project completion time?
Note: Do not round intermediate calculations. Round your answer to decimal places.
Step by Step Solution
There are 3 Steps involved in it