Question: The Following table is based on a time study for a metal working operation Obs (minutes per cycle) Element Performance Rating 1 2 3 4

The Following table is based on a time study for a metal working operation

Obs (minutes per cycle)
Element Performance Rating 1 2 3 4 5 5
A 108% 1.2 1.25 1.30 1.28 1.26 1.24
B 112% 0.83 0.81 0.78 0.81 0.83 0.79
C 105% 0.58 0.61 0.59 0.62 0.58 0.61

MUST SHOW ALL WORK TO RECEIVE FULL OR PARTIAL CREDIT.

a) Based on the number of observation, determine the standard time for the operation, assuming an allowance of 12 percent of job time.

b) How many observations would be needed to estimate the mean time for element B within 2 percent of its true value with a 95.5 percent confidence

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!