Question: The main tool this week is Material Requirements Planning (MRP). 1.PIMS, Inc., has been manufacturing plumbing equipment since 1999. Because of the depressed economic conditions,

The main tool this week is Material Requirements Planning (MRP).

1.PIMS, Inc., has been manufacturing plumbing equipment since 1999. Because of the depressed economic conditions, component parts are assembled in batch runs. At any given time, each level of production has several partially assembled components. Given the following assembly and inventory information, construct a product structure diagram for the oil leak valve, and plan the order releases necessary to assemble 400 oil leak valves for period 10.

Description of the Production Process

Production of the valve begins with the base. The base is placed and secured in a housing. Ball bearings are then installed on opposing sides of the base housing. The rear base cover is fitted on and held while the front cover is secured with U-bolts. Next, the anchor assembly is connected. Finally, two sets of brackets are screwed on and the oil leak valve is checked before shipping.

Assumethe use of the multiple of fixed lot sizes technique.

The main tool this week is Material RequirementsThe main tool this week is Material Requirements
\f\f

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!