Question: The network below represents a project being analyzed by the critical path method. Activity durations are A = 5, B = 2, C = 12,
The network below represents a project being analyzed by the critical path method. Activity
durations are A = 5, B = 2, C = 12, D = 3, E = 5, F = 1, G = 7, H = 2, I = 10, and J = 6.
What is the duration of the path A-B-E-H-J
a.
25
b.
30
c.
20
d.
21
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts