Question: The object of a statistical process control (SPC) system is to Select one: a. Provide a signal when assignable variations are present. b. Assess the
The object of a statistical process control (SPC) system is to
Select one:
a. Provide a signal when assignable variations are present.
b. Assess the customer expectations
c. Eliminate natural variation.
d. Provide a signal when natural variations are present.
Twenty samples of size 5 are taken from a stable process. The average means of the sample means is 42.5, and the average range of the sample is 1.5. What is the UCL for the x-bar chart?
Select one:
a. 47
b. 43.37
c. 42.5
d. 3.17
Twenty samples of size 5 are taken from a stable process. The average means of the sample means is 42.5, and the average range of the sample is 1.5. What is the UCL for the R-chart?
Select one:
a. 0
b. 43.37
c. 3.17
d. 1.5
For the last 30 days, the number of mistakes on the daily report has averaged 4.5. What would the UCL be if a 3-sigma c-chart was constructed?
Select one:
a. 10.86
b. 2.12
c. 7.5
d. 18
A bottling company runs a filling process that should fill bottles with 12 plus or minus 0.04 ounces. A capability study reveals that the process mean is 12 ounces and the standard deviation is 0.01 ounces. What is the capability of the bottling process?
Select one:
a. 1.5
b. 0.67
c. 0.75
d. 1.33
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts