Question: The operator starts his activities on a regular eight-hour shift with a half-hour break time as well as a planned maintenance time of 60 minutes.

The operator starts his activities on a regular eight-hour shift with a half-hour break time as well as a planned maintenance time of 60 minutes. The demand for machining is 600 Units, what is the production capacity of the inspection process?
The operator starts his activities on a regular
The operator starts his activities on a regular
Secuencia de proceso Proceso Mquina Operacin manual Operacin de mquina Tiempo de cambio de molde min seg min Unidades entre cambio plezas 1200 1500 seg 20 seg 15 M2-65 DR-234 | TP-110 min 401 301 Fresado Taladrado Roscado Inspeccin/ Verificacin diametro 3 | 22 1000 Cul es la capacidad de produccin del proceso de inspeccin (redondeo hacia abalor? sequence of the process process machine manual operation machine operation sec mold change time min sec min milling drilling threaded inspection M2-65 DR-234 TP-110 units between change pieces 1200 22 1500 1000

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!