Question: The operator starts its activities on a regular 8-hour shift with a half-hour break time as well as a planned maintenance time of 45 minutes.

The operator starts its activities on a regular 8-hour shift with a half-hour break time as well as a planned maintenance time of 45 minutes. The demand for machining is 940 units.
The operator starts its activities on a regular
Which processes will not be able to meet the customer's demand?
a) milling
b)screwed
c)inspection
d)boring
H quinados es de 940 unidades. points u mo regular de 8 horas con un tiempo de descanso de media hora asi como un tiempo de mantenimiento planeado de 15 min. La demanda de los Secuencia de proceso Proceso Mquina Operacin manual Operacin de mquina min ser Tiempo de cambio de molde min seg min 1 2 3 seg Unidades entre camblo piezas 100 1000 1000 Fre Fresado Taladrado Roscado Inspeccin/ Verificacin diametro M2-65 DR-234 Tin 125 3 21 11 30 40 les) proceso(s) no podrn cumplir con la demand H quinados es de 940 unidades. points u mo regular de 8 horas con un tiempo de descanso de media hora asi como un tiempo de mantenimiento planeado de 15 min. La demanda de los Secuencia de proceso Proceso Mquina Operacin manual Operacin de mquina min ser Tiempo de cambio de molde min seg min 1 2 3 seg Unidades entre camblo piezas 100 1000 1000 Fre Fresado Taladrado Roscado Inspeccin/ Verificacin diametro M2-65 DR-234 Tin 125 3 21 11 30 40 les) proceso(s) no podrn cumplir con la demand

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!