Question: The optimum duration for a project is at the point where:Direct costs are the lowestIndirect costs are the lowestDirect costs equal indirect costsTotal project costs
The optimum duration for a project is at the point where:Direct costs are the lowestIndirect costs are the lowestDirect costs equal indirect costsTotal project costs are the lowest