Question: The process batch at the constraint in a drum - buffer - rope system should be: Question content area bottom Part 1 A . of

The process batch at the constraint in a drum-buffer-rope system should be:
Question content area bottom
Part 1
A.
of such a size as to maximize the number of setups for the constraint
B.
the same size as the transfer batch.
C.
of such a size as to improve utilization of the constraint.
D.
the same size as that at any non-constraint.