Question: The process batch at the constraint in a drum - buffer - rope system should be: Question 1 5 options: the same size as that
The process batch at the constraint in a drumbufferrope system should be:
Question options:
the same size as that at any nonconstraint.
the same size as the transfer batch.
of such a size as to maximize the number of setups for the constraint.
of such a size as to improve utilization of the constraint.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock