Question: Consider the following scenario: You are the safety manager for a team that is working to 10-story addition to a hospital. The framework of the
Consider the following scenario: You are the safety manager for a team that is working to 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and poured with reinforced concrete on metal decking. The outside will require brick and glass window installation and installation of a standing seam metal roof. The interior will consist of metal stud framing with drywall and tile floors. The building will be centrally cooled and heated with a heating, ventilation, and air conditioning (HVAC) mechanical system, and it will need a new electrical supply source.
The electrical rooms will be located in the southeast corner of each floor near the stairwell. Plumbing and fire suppression systems must be installed. There will be a bank of elevators in the main entrance/northside center and a service elevator in the back/southside center. There is suspected asbestos in the flooring and piping where the new addition connects to the existing structure. A new entrance must be constructed off the side street/northside, with a driveway, sidewalks, drainage, lighting, and landscaping installed.
You must complete site-specific safety program (SSSP) for the project. You can use this SSSP template, or you may create one of your own. What should be included in an SSSP?
The project network diagram and baseline are given as below 0 1 2 1 3 1 1 OOD 0 0 ooo 0 O N3567 2 2 3 0 33 w 3 2 0 2 2 ID DUR ES LF 2 WNNNWN 2 3 2 Schedule information 4 2 3 GNWNOOo 0 2 2 3 2 4 4 1 1 3 2 5 SL 1 12 0 15 0 8 1 6 0 10 2 5 0 1 5 3 5 5 0 0 32 5 -0 NON 33250 1060 6 5 0 3 5 5 7 6 0 0 51 6 Bseline budget needs ($ 000) Time period Total PV 0 1 2 3 4 5 6 48 375 4 4 9 0 5 Legend ES ID EF SL RES SL LS DUR LF 33 64 333 5 Total PV by period 11 19 11 12 75 Cumulative PV by period 11 30 41 53 60 65 Answer the following two questions and fill in the blank in the correct sequence (the answer to Q1 should be filled in the first blank, the answer to Q2 should be filled in the second blank) Q1. At the ending period of 1, the actual cost of activity 1, 2, 3 are $6.000, $8,000, $3,000. The amount of work completed for activity 1, 2, 3 are 40%, 50%, 30%. What is the CPI of the project? [10 points] Note: for your answer, please use the format 1.234 (i.e. round-off to three decimal places and use the full stop as decimal separator) Q2. At the ending period of 4, activity 1 to 4 are all completed, activity 5 finished 40%, activity 6 finished 55%, activity 7 hasn't started yet. The actual cost of activity 1 to 6 are $13,000, $18,000, $10,000, $8,000, $3,000, $8,000. Your manager wants an update of the project performance, based on your data, what will the project finally cost at completion? [15 points] Note: for your answer, write numbers only. please use the format 123456 (i.e. round-off to the nearest integer number)
Step by Step Solution
3.48 Rating (151 Votes )
There are 3 Steps involved in it
Answer A SiteSpecific Safety Program SSSP is a comprehensive document that outlines the safety policies procedures and protocols for a specific construction project It is designed to identify and miti... View full answer