Question: The return period that a highway engineer must use in designing a critical underpass drain to ensure a hydrologic risk of failure of 0 .
The return period that a highway engineer must use in designing a critical underpass drain to ensure a hydrologic risk of failure of to a flood thst may exceed, at least once, during the years service life of the drain is about?
A years
B years
C years