Question: The time - phased net requirements for the base assembly in a table lamp over the next sixweeks areThe setup cost for the construction of
The timephased net requirements for the base assembly in a table lamp over the next sixweeks areThe setup cost for the construction of the base assembly is $ and the holding cost is$ per assembly per week.a Determine the lot sizes using the SilverMeal heuristic.b Determine the lot sizes using the least unit cost heuristic.