Question: The time-phased net requirements for the base assembly in a table lamp over the next six weeks are Week 1 2 3 5 6 Requirements

The time-phased net requirements for the base
The time-phased net requirements for the base assembly in a table lamp over the next six weeks are Week 1 2 3 5 6 Requirements 335 200 140 440 300 200 4 The setup cost for the construction of the base assembly is $200, and the holding cost is $0.50 per assembly per week. a. Determine the lot sizes using the Silver-Meal heuristic