Question: There was an error on your Work Breakdown structure. There are two tasks missing on it. Your job is to add two new tasks to
There was an error on your Work Breakdown structure. There are two tasks missing on it. Your job is to add two new tasks to the project. You will have to assign the appropriate resources to these new tasks. Next, you will have to update the Gantt Chart and check your new critical path. These two new tasks must be significant and disrupt the critical path. Finally, answer the following questions:
What will this do to your project completion time and the critical path?
What impact will this have to your resource schedule?
What impact will this have to your budget?
How would you overcome these problems?
The deliverable for this part of the project will be a formal letter to your supervisor (your instructor) that explains this error, the results of this error, and your recommendation on how to overcome these issues along with addressing the questions above. You will need to provide supporting documentation from MS Project in an Appendix. You will submit the letter as a MS Word file. You will also submit the MS Project file.
Bischop Landing Airfield Project Scope
4 July 2023
Project Objectives:
The objective of the Bischop Landing Airfield Project is to construct a new airfield that will be able to facilitate 92% local general aviation and 8% transient general aviation. The new airfield will be 2560x40 ft and will be made of reinforced concrete.
Project Deliverables:
- A new 2560x40 ft airfield made of reinforced concrete
- A drainage system to collect and divert stormwater
- Lighting for the airfield
- A safety fence around the airfield
- A maintenance building
Project Milestones
- Start of construction: June 14, 2023
- Completion of construction: June 14, 2024
- Acceptance of the project by the customer: July 1, 2024
Technical Requirements:
- The airfield must be able to support the weight of small aircraft.
- The airfield must be able to drain stormwater effectively.
- The airfield must be illuminated at night.
- The airfield must be fenced to prevent unauthorized access.
- The maintenance building must be equipped with the necessary tools and equipment to maintain the airfield.
Project Constraints or Limits:
- The project budget is $278,000.00.
- The project must be completed by June 14, 2024.
- The airfield must be able to support the weight of small aircraft.
Ethical and Social Responsibility Considerations:
- The project must be conducted in a safe and environmentally friendly manner.
- The project must be sensitive to the needs of the local community.
Customer Review:
The customer for the project is Mr. Matthew Gonzalez. Mr. Gonzalez will review the project at the following milestones:
- Start of construction
- Completion of construction
- Acceptance of the project
Part 2: Work Breakdown Structure (WBS)
Level 1
- Construction of the airfield
- Drainage system
- Lighting
- Safety fence
- Maintenance building
Level 2
- Excavation
- Concrete pouring
- Asphalt paving
- Stormwater drainage
- Lighting installation
- Safety fence installation
- Maintenance building construction
Level 3
- Excavation of the airfield site
- Removal of the old airfield
- Preparation of the ground for concrete pouring
- Pouring of the concrete foundation
- Asphalt paving of the airfield surface
- Installation of the stormwater drainage system
- Installation of the lighting system
- Installation of the safety fence
- Construction of the maintenance building
Durations
The following are the durations for each of the tasks:
- Excavation of the airfield site: 2 weeks
- Removal of the old airfield: 1 week
- Preparation of the ground for concrete pouring: 1 week
- Pouring of the concrete foundation: 2 weeks
- Asphalt paving of the airfield surface: 1 week
- Installation of the stormwater drainage system: 2 weeks
- Installation of the lighting system: 1 week
- Installation of the safety fence: 1 week
- Construction of the maintenance building: 4 weeks
Dependencies
The following are the dependencies between the tasks:
- The excavation of the airfield site must be completed before the removal of the old airfield can begin.
- The removal of the old airfield must be completed before the preparation of the ground for concrete pouring can begin.
- The preparation of the ground for concrete pouring must be completed before the pouring of the concrete foundation can begin.
- The pouring of the concrete foundation must be completed before the asphalt paving of the airfield surface can begin.
- The installation of the stormwater drainage system must be completed before the installation of the lighting system can begin.
- The installation of the lighting system must be completed before the installation of the safety fence can begin.
- The construction of the maintenance building must be completed before the project can be considered complete.
Critical Path
The critical path for the project is the sequence of tasks that must be completed on time in order for the project to be completed on time. The critical path for this project is:
- Excavation of the airfield site
- Removal of the old airfield
- Preparation of the ground for concrete pouring
- Pouring of the concrete foundation
- Asphalt paving of the airfield surface
- Installation of the stormwater drainage system
- Installation of the lighting system
- Installation of the safety fence
Milestones
The following are the milestones for the Bishop Landing Airfield Project:
- Start of construction: June 14, 2023
- Completion of excavation: July 1, 2023
- Completion of concrete pouring: July 15, 2023
- Completion of asphalt paving: August 1, 2023
- Completion of stormwater drainage system: August 15, 2023
- Completion of lighting system: September 1, 2023
- Completion of safety fence: September 15, 2023
- Completion of maintenance building: October 1, 2023
- Acceptance of the project by the customer: July 1, 2024