Question: this is 1 question with 2 parts, please answer both parts Q9) The SIMO chart for the task of assembling U-shape bolts was drawn, the

this is 1 question with 2 parts, please answer

this is 1 question with 2 parts, please answer both parts

Q9) The SIMO chart for the task of assembling U-shape bolts was drawn, the required right-han activities are listed sequentially in the table below: a-Fill the table with the appropriate therbligs. b-Draw the related Assembly process chart. Order Therblig 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Description of Activities Move the hand to the container of the U-shape bolts Choose a U-shape bolt Catch a U-shape bolt Carry it to the fixture Adjust it in the correct position to be fit in the fixture Insert it in the fixture Move the hand to the container of the Brackets Choose a Bracket Catch a Bracket Carry it to the fixture Adjust it in the correct position to be fit in the Assemble it Move the hand to the container of the Lock Washers Choose a Lock Washer Catch a Lock Washer Carry it to the fixture Adjust it in the correct position to be fit the Assemble it Move the hand to the container of the Hex nuts Choose a Hex nut Catch a Hex nut Transport it to the fixture Adjust it in the correct position to be fit the Assemble it Remove the assembly from the fixture Catch the assembly Carry the assembly to the storage box Release the assembly in the storage box 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!