Question: this is construction estimating. I need help calculating how to fill out the boxs Material cost Labor cost Equip. Cost Total Description of Work Quant.

this is construction estimating. I need help
this is construction estimating. I need help
this is construction estimating. I need help calculating how to fill out the boxs
Material cost Labor cost Equip. Cost Total Description of Work Quant. Unit TOTAL COST per Unit per Unit M+L+E 45.0 C.Y. 0.00 315.00 33.00 $348.00 $15,660.00 Demolish, remove pavement & curb, remove concrete, mesh reinforced to 6 thick, hydraulic hammer, excludes hauling and disposal fees Conduit, rigid galvanized steel, 1/2 to 1" diameter, electrical demolition, remove conduit to 15 high, including fittings & hangers Pointing masonry, re-point, mask and grout method, running bond 125.0 LF 150.0 SF Metal floor decking, steel, non-celular, composite, galvanized, 2'D. 100.0 SF 18 gauge Stair, spiral, steel, stock units, primed flat metal tread, 3-6 da 4.0 Flight 30.0 SF Gypsum waliboard, on walls, mold resistant 1/2" thick, finish excluded 100.0 SF 20.0 Ea. 50.0 SF Paints & Coatings, walls, concreto masonry units (CMU), smooth surface, first coat, latex, roler Sprinkler System Components, sprinder head escuchons, standard, brass tone, 1" size Insulation, ductwork, blanket type, fiberglass, flexible, FSK vapor barrier wrap, 75 b. density, 1-1/2" thick Fluorescent fixture, Interior, surface mounted, acrylic lens, 4-40 W, W x 4'L. indl lamps, mounting hardware and connections incandescent forture, residential exterior lantom, wall mounted, 60 watt 10.0 Ea 4.0 Ea. Toneer SES-COTOYUU YA UFO Material cost Labor cost Equip. cost Total TOTAL Quant. Unit Description of Work COST per Unit per Unit M L E per Unit 45.0 C.Y. 0.00 315.00 33.00 $348.00 $15,660.00 Demolish, remove pavement & curb, remove concrete, mesh reinforced, to 6* thick, hydraulic hammer, excludes hauling and disposal fees Conduit , rigid galvanized steel, 1/2 to 1" diameter, electrical demolition, remove conduit to 15 high, including fittings & hangers Pointing masonry, re-point, mask and grout method, running bond 125.0 LF 150.0 SF 100.0 SF Metal floor decking, steel, non-cellular, composite, galvanized, 2 D. 18 gauge Stair, spiral, steel, stock units, primed flat metal tread, 3-6 dia 4.0 Flight 80.0 SF Gypsum wallboard, on walls, mold resistant, 1/2" thick, finish excluded 100.0 SF 20.0 Ea. 50.0 SF Paints & Coatings, walis, concrete masonry units (CMU), smooth surface, first coat, latex, roller Sprinkler System Components, sprinkler head escutcheons, standard, brass tone, 1" size Insulation, ductwork, blanket type, fiberglass, flexible, FSK Vapor barrier wrap, .75 lb. density, 1-1/2" thick Fluorescent fodture, Interior, surface mounted, acrylic lens, 4-40 W, 'Wx4'LIncl lamps, mounting hardware and connections Incandescent forture, residential, exterior lantem, wall mounted, 60 watt 10.0 Ea. 4.0 Ea. Umor -08 SISU TOOL GYFCG York (27 Material cost Labor cost Equip. Cost Total Description of Work Quant. Unit TOTAL COST per Unit per Unit M+L+E 45.0 C.Y. 0.00 315.00 33.00 $348.00 $15,660.00 Demolish, remove pavement & curb, remove concrete, mesh reinforced to 6 thick, hydraulic hammer, excludes hauling and disposal fees Conduit, rigid galvanized steel, 1/2 to 1" diameter, electrical demolition, remove conduit to 15 high, including fittings & hangers Pointing masonry, re-point, mask and grout method, running bond 125.0 LF 150.0 SF Metal floor decking, steel, non-celular, composite, galvanized, 2'D. 100.0 SF 18 gauge Stair, spiral, steel, stock units, primed flat metal tread, 3-6 da 4.0 Flight 30.0 SF Gypsum waliboard, on walls, mold resistant 1/2" thick, finish excluded 100.0 SF 20.0 Ea. 50.0 SF Paints & Coatings, walls, concreto masonry units (CMU), smooth surface, first coat, latex, roler Sprinkler System Components, sprinder head escuchons, standard, brass tone, 1" size Insulation, ductwork, blanket type, fiberglass, flexible, FSK vapor barrier wrap, 75 b. density, 1-1/2" thick Fluorescent fixture, Interior, surface mounted, acrylic lens, 4-40 W, W x 4'L. indl lamps, mounting hardware and connections incandescent forture, residential exterior lantom, wall mounted, 60 watt 10.0 Ea 4.0 Ea. Toneer SES-COTOYUU YA UFO Material cost Labor cost Equip. cost Total TOTAL Quant. Unit Description of Work COST per Unit per Unit M L E per Unit 45.0 C.Y. 0.00 315.00 33.00 $348.00 $15,660.00 Demolish, remove pavement & curb, remove concrete, mesh reinforced, to 6* thick, hydraulic hammer, excludes hauling and disposal fees Conduit , rigid galvanized steel, 1/2 to 1" diameter, electrical demolition, remove conduit to 15 high, including fittings & hangers Pointing masonry, re-point, mask and grout method, running bond 125.0 LF 150.0 SF 100.0 SF Metal floor decking, steel, non-cellular, composite, galvanized, 2 D. 18 gauge Stair, spiral, steel, stock units, primed flat metal tread, 3-6 dia 4.0 Flight 80.0 SF Gypsum wallboard, on walls, mold resistant, 1/2" thick, finish excluded 100.0 SF 20.0 Ea. 50.0 SF Paints & Coatings, walis, concrete masonry units (CMU), smooth surface, first coat, latex, roller Sprinkler System Components, sprinkler head escutcheons, standard, brass tone, 1" size Insulation, ductwork, blanket type, fiberglass, flexible, FSK Vapor barrier wrap, .75 lb. density, 1-1/2" thick Fluorescent fodture, Interior, surface mounted, acrylic lens, 4-40 W, 'Wx4'LIncl lamps, mounting hardware and connections Incandescent forture, residential, exterior lantem, wall mounted, 60 watt 10.0 Ea. 4.0 Ea. Umor -08 SISU TOOL GYFCG York (27

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!