Question: This is the Case Studies from CONTROL SYSTEMS ENGINEERING: Seventh Edition. Please go step by step. Antenna Control: Lag - Lead Compensation For the antenna

This is the "Case Studies" from "CONTROL SYSTEMS ENGINEERING: Seventh Edition." Please go step by step.
Antenna Control: Lag-Lead Compensation
For the antenna azimuth position control system case study in Chapter 8, we obtained a 25% overshoot using a simple gain adjustment. Once this percent overshoot was obtained, the settling time was determined. If we try to improve the settling time by increasing the gain, the percent overshoot also increases. In this section, we continue with the antenna azimuth position control by designing a cascade compensator that yields 25% overshoot at a reduced settling time. Further, we effect an improvement in the steady-state error performance of the system.
PROBLEM: Given the antenna azimuth position control system shown on the front endpapers, Configuration 1, design cascade compensation to meet the following requirements: (1)25% overshoot, (2)2-second settling time, and (3) K_(v)=20.
This is the "Case Studies" from "CONTROL SYSTEMS

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!