Question: TinyHands Corp makes energy tablets. Their current process for manufacturing a tin of their High Energy tabs is given in the table below (note that

TinyHands Corp makes energy tablets. Their

TinyHands Corp makes energy tablets. Their current process for manufacturing a tin of their "High Energy" tabs is given in the table below (note that a workstation may perform more than one task). They currently operate by staffing one person per workstation, and a workstation costs $20/day to operate (in addition to the $10/hr labor costs of performing the process tasks). They operate for 8 hours a day. The tasks ABCDEF must be done one after the other, in order. TinyHands has recently seen an increase in demand of 50% and desires to increase their capacity by 50%. Workstation Task time 1 Task Task ID A Take 10 tins from supply bin B Fill 10 tins with ten tabs each C Place ten tins in a ten unit package D Wrap ten unit package with plastic wrap E Stamp package with logo and UPC F Load ten tin package onto distribution truck 1 2 60 seconds 30 seconds 30 seconds 30 seconds 10 seconds 30 seconds Units (tins) processed 10 10 10 10 10 10 3 3 4 Complete the following requirements: Part 1: 1. Draw the process in both (two diagrams) station flowchart form and task precedence diagram form. 2. On flow chart, by each station, write the capacity (tins/day), the cycle time (sec/tin), and utilization percentage. 3. On the flowchart, identify the bottleneck station in the current process. 4. What is the cycle time, capacity, and utilization of the process (units=tins)? 5. Calculate the cost per unit of output. TinyHands Corp makes energy tablets. Their current process for manufacturing a tin of their "High Energy" tabs is given in the table below (note that a workstation may perform more than one task). They currently operate by staffing one person per workstation, and a workstation costs $20/day to operate (in addition to the $10/hr labor costs of performing the process tasks). They operate for 8 hours a day. The tasks ABCDEF must be done one after the other, in order. TinyHands has recently seen an increase in demand of 50% and desires to increase their capacity by 50%. Workstation Task time 1 Task Task ID A Take 10 tins from supply bin B Fill 10 tins with ten tabs each C Place ten tins in a ten unit package D Wrap ten unit package with plastic wrap E Stamp package with logo and UPC F Load ten tin package onto distribution truck 1 2 60 seconds 30 seconds 30 seconds 30 seconds 10 seconds 30 seconds Units (tins) processed 10 10 10 10 10 10 3 3 4 Complete the following requirements: Part 1: 1. Draw the process in both (two diagrams) station flowchart form and task precedence diagram form. 2. On flow chart, by each station, write the capacity (tins/day), the cycle time (sec/tin), and utilization percentage. 3. On the flowchart, identify the bottleneck station in the current process. 4. What is the cycle time, capacity, and utilization of the process (units=tins)? 5. Calculate the cost per unit of output

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!