Question: triangle in a material flow map would best represent? Question 1 5 options: a ) A machine b ) A holding area for WIP inventory
triangle in a material flow map would best represent?
Question options:
a
A machine
b
A holding area for WIP inventory
c
The end of an assembly line
d
A quality inspection that may result in a product being reworked