Question: Trucks using a single server loading dock have a mean arrival of 8 per day. The loading / unloading rate is u = 9 per
Trucks using a single server loading dock have a mean arrival of per day. The loadingunloading rate is u per day.
The cost of operating the unloadingloading server is u$ per hour and the cost of a truck waiting at rhe facility is $ per truck per hour including the truck being served
A calculate the total cost per hour
B propose a service rate u that minimizes the cost in part a