Question: try to fill this sheet and show clearly steps fill the TF FF stuffs Is this clear total float and free float Duration (days) -
try to fill this sheet and show clearly steps
fill the TF FF stuffs
Is this clear
total float and free float
Duration (days) - IPA TREL (LAG) ES EF H LI FF 5 3 2 4 3 9 5 5 Activity 2 Permissued 3 Mobilization 4 Ste Clearing 5 Excavation 6 Foundation Formwork 7 Concrete 8 Stud Framing 9 Formwork Stripping / Back 10 Roof Truss Framing 11 Roof Sheathing/instol Roof The 12 Rough Electrical and Plumbing 13 Rough Inspection 14 Exterior Wat Sheathing 15 Interior Drywal 16 Instal Doors and Windows 17 Interior and Exterior Painting 18 Finish Electrical and Plumbing 19 Install Fixtures 20 Certificate of Occupancy/Clean-up 21 Activity ID 100 110 120 130 140 150 160 165 170 175 180 190 200 210 220 290 2 4 100 110 SS111 110,120 130 140 150 FS[2871 1601554421 160, 165[FFON 160 (15031 17051301 175,180 180, 190 200 210 220 230 240 20 3 5 3 5 2 3 2 250 260 240 250 IPA [REL. (LAG)! Duration (days) 1 5 ES 3 Activity Permit issued Mobilization Site Clearing Excavation Foundation Formwork Concrete Stud Framing Formwork Stripping/Backfil Roof Truss Framing Roof Sheathing install Roof Tile Rough Electrical and Plumbing Rough Inspection Extenor Wall Sheathing Interior Drywall Instal Doors and Windows interior and Exterior Painting B Finish Electrical and Plumbing 9 Instal Foctures Certificate of Occupancy/Clean-up Activity ID 100 110 120 130 140 150 160 165 2 4 3 9 S S 2 100 110 (SS(1) 110,120 130 140 150 (FS(28) 160 (55(4)] 160, 165[FF(0)1 160 (FS(3) 170 (FS(331 175, 180 180.190 200 210 4 3 S 5 170 175 180 190 200 210 220 230 240 250 3 5 2 3 2 220 230 240 (FS 21 240,250 260 IPA TREL (LAG) ES EF LS LF TF FF Duration (days) 1 5 3 2 4 3 9 Activity Permit issued Mobilization Site Clearing Excavation Foundation Formwork Concrete Stud Framing Formwork Stripping Backfil Roof Truss Framing Roof Sheathing/Instal Roof Tile Rough Electrical and Plumbing Rough inspection Exterior Wall Sheathing Interior Drywall Instal Doors and Windows interior and Exterior Painting Finish Electrical and Plumbing Instal Fixtures Certificate of Occupancy / Clean-up 5 5 2 4 Activity ID 100 110 120 130 140 150 160 165 170 175 180 190 200 210 220 230 240 250 260 100 110 (SS(1) 110,120 130 140 150 [FS(281 160 (SS(4) 160, 165/FF(0 160 [F(3) 170 F(312 175,180 180,190 200 210 220 230 240 15 23 240 250 5 5 3 5 2 3 2
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock