Question: undefined IPA [REL. (LAG)] Activity Permit Issued Mobilization Site Clearing Excavation Foundation Formwork Concrete Stud Framing Formwork Stripping / Backfill Roof Truss Framing Roof Sheathing

undefined IPA [REL. (LAG)] Activity Permit Issuedundefined IPA [REL. (LAG)] Activity Permit Issuedundefined IPA [REL. (LAG)] Activity Permit Issuedundefined

IPA [REL. (LAG)] Activity Permit Issued Mobilization Site Clearing Excavation Foundation Formwork Concrete Stud Framing Formwork Stripping / Backfill Roof Truss Framing Roof Sheathing / Install Roof Tile Rough Electrical and Plumbing Rough Inspection Exterior Wall Sheathing Interior Drywall Install Doors and Windows Interior and Exterior Painting Finish Electrical and Plumbing Install Fixtures Certificate of Occupancy / Clean-up Duration (days) 1 5 3 2 4 3 9 5 5 2 4 3 5 5 3 5 2 Activity ID 100 110 120 130 140 150 160 165 170 175 180 190 200 210 220 230 240 250 260 100 110 (SS(1)] 110,120 130 140 150 [FS(28)] 160 (SS(4)] 160, 165[FF(0)] 160 (FS(3)] 170 (FS(3)] 175,180 180,190 200 210 220 230 240 (FS(2)] 240,250 NWN (a) Create a Node Network Schedule, based on the constraints provided in the following table. (b)Provide a forward and backward pass on the given network and fill-out the EXCEL SPREAD SHEET provided on CANVAS, with all necessary field data to be included as part of the calculation package. (c) Evaluate all Total Floats and Free Floats by providing additional calculations to evaluate Total Floats based on DRF, URF, and SRF results. (d) Describe all critical paths in the network schedule, using the format: ID# - ID# - ID# ... Project Finish or Activity ID # (a) Create a Node Network Schedule, based on the constraints provided in the following table. (b)Provide a forward and backward pass on the given network and fill-out the EXCEL SPREAD SHEET provided on CANVAS, with all necessary field data to be included as part of the calculation package. (c) Evaluate all Total Floats and Free Floats by providing additional calculations to evaluate Total Floats based on DRF, URF, and SRF results. (d) Describe all critical paths in the network schedule, using the format: ID# - ID# - ID# ... Project Finish or Activity ID #

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!