Question: Under wax circumstances should cost or schedule baseline be changed? If the approved change has gone through the perform integration change control process. If the

Under wax circumstances should cost or schedule baseline be changed? If the approved change has gone through the perform integration change control process. If the cost of schedule status update is required. If the customer approves the change. If the change has been approved.