Question: URGENT! Note: Please, use 4 decimal points in answering the questions of this problem. A continuous stop watch time study was conducted on an operation

URGENT!
Note: Please, use 4 decimal points in answering the questions of this problem. A continuous stop watch time study was conducted on an operation that consists of 5 elements as shown in the table below: Elements 1 2 3 4 5 Ratings Load 0.1598 1.423 2.668 3.936 5.196 88 machine 3.251 4.519 5.779 100 Run 0.7431 2.007 (Automatic) Unload 1.035 2.288 machine 3.553 4.805 6.089 99 1.266 2.51 3.784 5.041 6.325 125 Inspect Material handling 6.593 111 Note: All measurement units are in term of minutes. Allowances (%) Selected Time Tsel1 = Normal Time Tnor 1 = A1 = 3 Tsel2 = Tnor2 A2= Tsers Thors- A3= r Tsel4= Tnor4= A4= r Tsel5= Tnor5= A5= Q1- Assuming 3% personal allowances and 3% fatigue allowances and 2% Delay allowances, find the standard time to produce one unit? Standard time (element 1)= minutes Standard time (element 2)= minutes Standard time (element 3)= minutes Standard time (element 4)= minutes Standard time (element 5)= minutes Total Standard Time= v minutes Q3 - How many units can be produced per week (assuming 8 hours of work/day
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
