Question: Use the below table for constructing a Project Network (AON), identify the possible paths, accordingly the critical path and the project duration. Activities Predecessor

Use the below table for constructing a Project Network (AON), identify the

Use the below table for constructing a Project Network (AON), identify the possible paths, accordingly the critical path and the project duration. Activities Predecessor Duration A B 9 4 C A 5 D A 12 E A 10 F B 12 G C H E, F J K G, D, H H, M L J 179373 M F