Question: Use the deferrable server method to design a scheduler for period tasks T 1 and T 2, and an aperiodic task A. Rate-Monotonic: - A:r
Use the deferrable server method to design a scheduler for period tasks T1 and T2, and an aperiodic task A.

Rate-Monotonic: - A:r = 2.0, e = 0.8 Tos=(3, 0.5) T,=(2, 3.5, 1.5, 3.5) T2=(6.5, 0.5) Budget Rate-Monotonic: - A:r = 2.0, e = 0.8 Tos=(3, 0.5) T,=(2, 3.5, 1.5, 3.5) T2=(6.5, 0.5) Budget