Question: Use the process information provided in the following table, when the sequence of flow is A B (any machine can be used if available) C
Use the process information provided in the following table, when the sequence of flow is A B (any machine can be used if available) C D (any machine can be used if available).
| Operation | Number of Units of Equipment | Design Capacity (by equipment) | Planned Utilization (overall) |
| A | 1 | 520 units/hr | 67.0% |
| B | 4 | 95, 85, 125, 75 | 62.5% |
| C | 1 | 285 units/hr | 90.0% |
| D | 2 | 475, 450 | 80.0% |
Calculate the maximum (design) capacity and effective capacity. (Round "Effective capacity" to 2 decimal places.)
| Units/hr | |
| Maximum Capacity | |
| Effective Capacity |