Question: Use the process information provided in the following table, when the sequence of flow is A B (any machine can be used if available) C
Use the process information provided in the following table, when the sequence of flow is A B (any machine can be used if available) C D (any machine can be used if available).
| Operation | Number of Units of Equipment | Design Capacity (by equipment) | Planned Utilization (overall) |
| A | 1 | 320 units/hr | 70.0% |
| B | 4 | 50, 40, 80, 30 | 80.0% |
| C | 1 | 230 units/hr | 65.0% |
| D | 2 | 220, 55 | 90.0% |
Calculate the maximum (design) capacity and effective capacity.